|
Value Engineering is the
core methodology used for achieving the defined deliverables of the
other Value Improvement Practices.
|
|
Most VIPs are in fact the
objectives or focus of the application of the Value Methodology, which
may be applied in the context of Value Analysis, detailed Value
Engineering or the broader context of Value Management. A typical Value
Study will encompass the objectives of several VIPs. |
Click here
for further information |
Example Application:
|
Project:
Sewage Collection from 22 Municipal Districts
(click for details)
|
Status:
Some areas already designed and under construction; other areas at
master planning stage |
|
Scope of Study:
To improve design methods, reduce construction costs and manage risks
in trunk sewer network and collection system. |
|
Workshop Output:
Potential cost savings of 9% (US$45M) capital cost and 2 years
construction time, together with significant reduction in annual
operational costs. |
|
|