 |
Simplifying process for achieving better
reliability and less potential risk |
 |
Identifying the sources of
risk at whatever stage of a business, program or project
(click for details)
 |
Identification and
conceptualization |
 |
Design and construction /
fabrication |
 |
Operation |
|
 |
Determining what the risks
are
and their significance |
 |
Determining the cost and
time elements of such risks |
 |
Optioneering of the
mitigation or removal of such risks and resulting greater reliability |
 |
The understanding of
secondary and residual risks |
 |
Optimized Life cycle costing |
 |
Avoidance of unnecessary
cost |